CONSTRUCTION HUB

Provision of Consultancy Services – Design, Supervision & Project Management Phase IV Campus Expansion Project (Classrooms, Biomedical Science Laboratory & Transformative Learning Centre)-UGHE (Deadline: 12/10/2025)

REQUEST FOR EXPRESSION OF INTEREST (EOI) Provision of Consultancy Services – Design, Supervision & Project ManagementPhase IV Campus Expansion Project (Classrooms, Biomedical Science Laboratory & Transformative Learning Centre)  Date: 24th September 2025 The University of Global Health Equity (UGHE) invites eligible consultancy firms to submit applications for prequalification for the provision of Design, Supervision, and

Read More

Terms of Reference for the Supply of Rain Water Harvesting Tanks – IMBARAGA Farmers Organization (Deadline: 29/09/2025)

Terms of Reference for the Supply of Rain Water Harvesting Tanks – IMBARAGA Farmers Organization (Deadline: 29/09/2025) Umuryango w’Abahinzi n’Aborozi bo mu Rwanda «IMBARAGA» Organisation des Agriculteurs et Eleveurs du Rwanda BP 1462 Kigali, Tél +250788843303 | +250788610584 ;E-mail: info@imbaraga.org; website: www.imbaraga.org TERMS OF REFERENCE  FOR THE SUPPLY OF RAIN WATER HARVESTING TANKS 1. Background IMBARAGA Farmers Organization is a

Read More

Topographer -2 positions at Rustiro District ( Deadline: 01/10/2025)

Topographer -2 positions at Rustiro District ( Deadline: 01/10/2025) Job responsibilities o Make contour lines where landscape activities will be implemented by using dump level and A-frames; o Having basic knowledge in reading maps and slope measurement o Analyze GIS data; o Produce maps of executed works and submit their shapefiles; o Use his/her own

Read More

Contract Manager at GS Engineering and Construction Corps through QSSR ( Deadline: 05/10/2025)

Contract Manager at GS Engineering and Construction Corps through QSSR ( Deadline: 05/10/2025) QSSR-GS ENGINEERING and CONSTRUCTION CORPS-CONTRACT MANAGER Job Description Role Summary Lead the commercial backbone of the Rwanda Transmission & Substation Project across procurement, logistics & customs, invoicing & billing, document control, and subcontractor management. As an EPC construction contractor, we own the full documentation

Read More

Procurement Assistant at UMC JV

Procurement Assistant at UMC JV About the job We are seeking a Procurement Assistant Officer to join our team in Rwanda. This role is vital in supporting the procurement function, ensuring cost-effective and timely sourcing of goods and services, while building strong supplier networks across Rwanda and the surrounding region. The ideal candidate will have

Read More

Maintenance Engineer at Masterpiece

Job Title: Maintenance Engineer for a Commercial space Job Summary: We are currently looking for a detail-oriented and organized individual to join our as our Senior Maintenance engineer for Masterpiece. The ideal candidate will be responsible for overseeing the upkeep of Masterpiece’s infrastructure, including resolving electrical, plumbing, HVAC, and fit-out issues, as well as coordinating

Read More

Request for Proposal: Modification of Cassava Warehouse, Fabrication and Installation of Processing Equipment- Centro International de Agricultura Tropical (Deadline: 08/10/2025)

Request for Proposal: Modification of Cassava Warehouse, Fabrication and Installation of Processing Equipment- Centro International de Agricultura Tropical (Deadline: 08/10/2025) REQUEST FOR PROPOSAL: MODIFICATION OF CASSAVA WAREHOUSE, FABRICATION AND INSTALLATION OF PROCESSING EQUIPEMENT Date : 23rdSeptember 2025 GENERAL INFORMATION ABOUT THE ALLIANCE OF BIOVERSITY INTERNATIONAL AND CIAT The Alliance of Bioversity International and the International Center for

Read More

Surveyor at Musanze district- 3 positions (Deadline: 30/09/2025)

Surveyor at Musanze district- 3 positions (Deadline: 30/09/2025) Job responsibilities – Making contour lines where landscape activities will be implemented by using dump level and A-frames; – To analyse GIS data; – To produce maps of executed works and submit their shape files; – Ensure erosion control measures are installed according to design specifications; –

Read More